DESCRIPTION

S-Curve Wall Shelf | Free Sculptural Bent Plywood 3D Model

DescriptionS-Curve Wall Shelf is a contemporary sculptural wall-mounted furniture model featuring a continuous flowing form inspired by bent plywood construction. The elegant S-shaped geometry combines functional shelving with decorative wall art, creating a distinctive architectural element for modern interiors.

The model was created at real-world scale and organized for architectural visualization, interior design, furniture presentation, rendering, editing, and further fabrication development.

Main FeaturesSculptural continuous S-shaped designBent plywood inspired geometryContemporary minimalist furniture styleReal-world scale in millimetersOverall dimensions approximately 1320 × 508 × 178 mmApproximate material thickness 25 mmClean and organized geometrySmooth continuous curved formSuitable for close-up architectural visualizationSuitable for furniture and interior renderingSuitable for residential and commercial interiorsOrganized model structureCompatible with multiple CAD, modeling, and rendering workflowsIncluded File Formats

The package can include:

3DM, FBX, OBJ,DWG, DXF

Only list formats that are actually included in the download package.

Suitable For

Residential interiors, living rooms, bedrooms, reception areas, offices, cafés, restaurants, hotels, retail spaces, hospitality projects, architectural visualization, interior rendering, furniture visualization, furniture presentations, concept design, computational design studies, CNC development, and digital fabrication studies.

Model Structure

The shelf is modeled as a continuous sculptural furniture element with organized geometry suitable for editing, material assignment, visualization, and further design development.

Free Product Note

This model is provided free of charge for personal, educational, and commercial visualization projects. Redistribution or resale of the original model files as a standalone product is not permitted.

REVIEWS & COMMENTS

See what other buyers think about this model - real feedback on quality,
accuracy, and usability.
There are no reviews or comments yet. Please be the first one to write it.
NEW
Recently added to CGTrader - explore one of the latest models on the marketplace.

S-Curve Wall Shelf Free 3D model

Royalty Free License (no AI)
Like this model to show appreciation to the designer.
See how many times this model was viewed.
Share this model to support the designer and boost their visibility.
Native file format
3DM3 files
Size: 506 MB
V-Ray 7 | 8
V-Ray 7 | 8
Exchange formats
OBJ
OBJ | 3 files<br />File Size: 218 MB
FBX
Autodesk FBX | 2 files<br />File Size: 289 MB
DXF
DXF | 2 files<br />Version: 2007<br />File Size: 217 MB
DWG
AutoCAD | 2 files<br />Version: 2007<br />File Size: 217 MB
PNG
PNG<br />File Size: 217 MB
JPG
JPG<br />File Size: 217 MB
Verified by CGTrader
Verified models are of higher quality as they have
passed CGT Standard technical and visual checks,
making them more professional-grade 3D assets.
Learn more.
FBX
This FBX file has successfully passed the CGT Standard technical and visual checks. The verification results are detailed in the section below.
File & scene
Binary FBX
Binary FBX file is more compact and faster to load and process.
Learn more
No unsupported objects
Unsupported objects:
- Lights
- Cameras
Learn more
Geometry
No N-gons
N-gons are polygons with five or more sides which might cause issues in certain processes like rendering or animation. Learn more
No faceted geometry
Faceted geometry uses flat surfaces without smoothing, which can look unrealistic on curves.
Learn more
Manifold geometry
Manifold geometry ensures all surfaces are properly connected, avoiding issues like edges shared by more than two faces.
Learn more
Textures & material
PBR textures
PBR textures simulate how light interacts with materials, making the model look realistic under different lighting.
Required PBR textures:
- Base Color
- Roughness
- Metalness
- Normal
Learn more
No embed textures
Embedded textures are stored inside the model file, increasing its size and sometimes causing compatibility issues.
Learn more
Square textures
Texture aspect ratio is the width-to-height ratio of a texture. Expected texture aspect ratio: 1:1
Learn more
Power of 2 texture sizes
Textures with dimensions in power of two (e.g. 512x512px, 1024x1024px) are used to optimize performance and memory usage.
Learn more
Assigned materials
Materials are applied to the 3D model to allow visualize a model's surface properties and appearance.
Learn more
UVs & naming
No UV overlaps
UVs overlap when multiple points on the 3D model's surface are mapped to the same point on the UV island causing texture stretching.
Learn more
UV unwrapped model
A UV unwrapped model means its 3D surface is flattened into 2D space, allowing textures to be applied accurately.
Learn more
Allowed characters
Allowed ASCII characters: a-zA-Z0-9-_
Learn more
Provided by designer
Information and details shared directly by the model's designer.
3D Features
Textures
The model includes image files (textures) that add color, patterns, or detail to its surfaces.
Materials
The model has material settings that define how surfaces look (color, shine, transparency, etc.).
Plugins Used
Some external plugins were used to create the model. These may be required for full functionality.
3D printing
Indicates whether the designer marked this model as suitable for 3D printing.
Model is not 3D printable
The designer indicates this model is intended for digital use only (rendering, animation, or AR/VR) and not for 3D printing.
Geometry
Nurbs
A model created with curved surfaces using mathematical splines, not polygons.
6815 polygons
The total number of polygons (flat shapes) that make up the 3D model.
/
6070 vertices
The number of points (corners) that define the shape of the model's polygons.
Unwrapped UVs
Publish date
Model ID
Chat