DESCRIPTION

METHOD STATEMENT OF TEMPORARY WORKS FOR CIRCULAR HOLLOW SECTION AND REINFORCEMENT 3D VIEW REVIT

Technical detail:

Originally modelled: Revit 2020 and above

Model: correctly scaled

Formats: Revit 2020 and above

REVIEWS & COMMENTS

See what other buyers think about this model - real feedback on quality,
accuracy, and usability.
There are no reviews or comments yet. Please be the first one to write it.
BEST PRICE GUARANTEED
Found this model cheaper on another marketplace? Let our support team know - we’ll match it.

MS-01-METHOD STATEMENT OF TEMPORARY WORKS 3D MODEL 3D model

$12.75
Royalty Free License
Created by
Like this model to show appreciation to the designer.
See how many times this model was viewed.
Share this model to support the designer and boost their visibility.
Native file format
RFA
Size: 11.4 MB
2020
Exchange formats
FBX
Autodesk FBX | 2 files<br />Version: 2015<br />File Size: 72.3 MB
DWG
AutoCAD<br />Version: 2010<br />File Size: 7.98 MB
Provided by designer
Information and details shared directly by the model's designer.
3D Features
Textures
The model includes image files (textures) that add color, patterns, or detail to its surfaces.
Materials
The model has material settings that define how surfaces look (color, shine, transparency, etc.).
3D printing
Indicates whether the designer marked this model as suitable for 3D printing.
Model is not 3D printable
The designer indicates this model is intended for digital use only (rendering, animation, or AR/VR) and not for 3D printing.
Unwrapped UVs
Publish date
Model ID
Chat