1/14
This is a fully package for Pedestrian Bridge Construction Phasing with the full 3D model textured and illuminated outdoor scene, Render - exterior ready to render with Lumion 12 or higher, and Premiere Pro Template.
The animation you just saw was made using the Lumion animated phasing effect. You can show the process of your design, or show the construction with this powerful animation tool. You can apply different transition effects, show how new materials apply to your design, make parts of your building appear and disappear and highlight what makes your project unique.
This is done using Lumion Render rendering software for architectural visualization. It’s a great 3D render software that saves a ton of time for architects because it helps you achieve the level of detail and realism not available in any other similar software.Introducing our Premiere Pro template: Pedestrian Bridge Construction Phasing Animation! Showcase the captivating journey of building a pedestrian bridge, with seamless transitions and realistic animations. Perfect for architects, engineers, and construction companies. Unveil the artistry of engineering with this mesmerizing template.
3D model Native file
- Sketchup (native) (.skp) from 2013 version and higher.
- Exports: All file exports are exported using Sketchup default settings. (grass, car, canvas arts and pool water not exported): export files and is ready to render with Lumion 12 or higher.
- The model is provided in both the default Sketchup file, in separate Lumion files.
Render – exterior scene and video effect for Construction Phasing Animation
- Rendered scene in Lumion format (.ls12)
- Light setup.
- 3 camera settings
Video editing Premiere Pro for Construction Phasing Animation
This file does not have any type of protection. You can reuse the scene, the render settings, the lights, the materials, but above all you can learn from the file, moving inside the project, observing how the light was created and handled, how materials are developed, what is the role that all textures play within them, and the values that fill every single option.This fully textured exterior scene includes trees, grass, furnitures, and it's ready to render with Lumion 12 or higher.
- The actual files have been created with Sketchup 2013 and Lumion 12.
ENJOY IT!
REVIEWS & COMMENTS
accuracy, and usability.