DESCRIPTION

This high-quality 3D model features a modular Urban Park and Plaza design, perfect for luxury residential projects, commercial landscapes, or city planning visualizations. The centerpiece is a series of S-shaped modular seating units integrated with vibrant red planters, creating a contemporary and inviting social space.

The environment is built on a detailed wood decking platform, surrounded by lush greenery, including realistic trees, flowering shrubs, and manicured grass areas. This asset is designed to be easily integrated into larger scenes or used as a standalone modular unit for exterior architectural visualization.

Key Features:• Modular Versatility: The S-shaped benches and planters can be rearranged or duplicated to fit various site configurations.• High-Detail Vegetation: Includes a diverse mix of botanically accurate trees and flowering plants, optimized for close-up renders.• Contemporary Materials: Features a striking contrast between natural wood decking, organic greenery, and bold red architectural accents.• ArchViz Ready: Perfectly suited for high-end architectural renderings, urban development proposals, and realistic game environments.

Technical Specifications• Geometry: Total Polygonal: 2758512 Total Verts: 4060630• Geometry Average per asset: Polygonal: 50095 Total Verts: 36304• Textures: Included (Diffuse, Normal, Roughness)• Materials: PBR Ready• Scale: Real-world metric scale• Format: [3dsMax, Vray, Corona, Blender, OBJ, FBX, GLtf, STL,USD]

REVIEWS & COMMENTS

See what other buyers think about this model - real feedback on quality,
accuracy, and usability.
There are no reviews or comments yet. Please be the first one to write it.
BEST PRICE GUARANTEED
Found this model cheaper on another marketplace? Let our support team know - we’ll match it.
NEW
Recently added to CGTrader - explore one of the latest models on the marketplace.

Contemporary S-Curve Seating and Greenery Set Low-poly 3D model

$25.00
Royalty Free License
Hire
Like this model to show appreciation to the designer.
See how many times this model was viewed.
Share this model to support the designer and boost their visibility.
File formats
STL
Stereolithography<br />File Size: 105 MB
OBJ
OBJ<br />File Size: 113 MB
GLTF
glTF<br />File Size: 207 MB
USD
USD<br />File Size: 195 MB
JPG
JPG | 3 files<br />File Size: 816 MB
EXR
EXR<br />File Size: 195 MB
PNG
PNG | 3 files<br />File Size: 816 MB
FBX
Autodesk FBX<br />File Size: 269 MB
MAX
Autodesk 3ds Max | 2 files<br />Version: 2023 - Renderer: V-Ray<br />Version: 2021 - Renderer: Corona<br />File Size: 621 MB
DAE
Collada<br />File Size: 208 MB
BLEND
Blender<br />Version: 5 - Renderer: Cycles<br />File Size: 218 MB
Provided by designer
Information and details shared directly by the model's designer.
3D Features
PBR
Uses Physically Based Rendering materials, which give the model realistic lighting and surface properties.
Textures
The model includes image files (textures) that add color, patterns, or detail to its surfaces.
Materials
The model has material settings that define how surfaces look (color, shine, transparency, etc.).
UV Mapping
The model's surfaces are mapped to a 2D image, allowing textures to display correctly.
3D printing
Indicates whether the designer marked this model as suitable for 3D printing.
Model is not 3D printable
The designer indicates this model is intended for digital use only (rendering, animation, or AR/VR) and not for 3D printing.
Geometry
Polygon mesh
A model built from polygons (triangles or quads) connected in a mesh.
2758512 polygons
The total number of polygons (flat shapes) that make up the 3D model.
/
4060630 vertices
The number of points (corners) that define the shape of the model's polygons.
Unwrapped UVs
Publish date
Model ID
Chat