DESCRIPTION

3d model for with Lumion Render

REVIEWS & COMMENTS

See what other buyers think about this model - real feedback on quality,
accuracy, and usability.
There are no reviews or comments yet. Please be the first one to write it.
BEST PRICE GUARANTEED
Found this model cheaper on another marketplace? Let our support team know - we’ll match it.

Qusais Police Station 3D model

Royalty Free License (no AI)
Hire
Like this model to show appreciation to the designer.
See how many times this model was viewed.
Share this model to support the designer and boost their visibility.
File formats
FBX
Autodesk FBX | 2 files<br />Version: 2023<br />File Size: 6.3 MB
RFA
Autodesk Revit<br />Version: 2023 - Renderer: Default 2023<br />File Size: 8.04 MB
MAX
Autodesk 3ds Max<br />Version: 2023 - Renderer: Default (Scanline) 2023<br />File Size: 4.39 MB
LS10
Lumion<br />Version: 12<br />File Size: 182 MB
OTHER
Other<br />File Size: 182 MB
Provided by designer
Information and details shared directly by the model's designer.
3D Features
Materials
The model has material settings that define how surfaces look (color, shine, transparency, etc.).
Plugins Used
Some external plugins were used to create the model. These may be required for full functionality.
3D printing
Indicates whether the designer marked this model as suitable for 3D printing.
Model is not 3D printable
The designer indicates this model is intended for digital use only (rendering, animation, or AR/VR) and not for 3D printing.
Unwrapped UVs
Publish date
Model ID
Chat