The work was completed according to the following customer requirements:
- Minimum welded joint.
- Tightness of the upper dome against coolant leaks.
- Ergonomics of operation.
- Ease of removal of the upper dome.
- Sliding door.
- Industrial design.
The work was completed on a turnkey basis for the customer and is in production. The main requirements of the customer are a minimum of welded seams; the priority is the assembly of panels with riveting. The basis and model for the design was the German company Datron and its version - three support legs for a CNC machine.I want to inform you that this project has only 3D design and is not time tested.I offer you two prices.
- 150$ - Includes STEP assembly, all elements (except CNC machine) unchanged.
- 850$ - Originals resized in Solidworks according to your requirements + STEP+PDF documentation