All questions regarding the project can be asked in direct instagram (@ta6urkin) or by e-mail (ta6urkin@gmail.com)
The 3D model is not included in the project.
This is a digital product (there is no physical product) intended for the independent production of sheet metal products. You should be able to cut out parts on a CNC metal cutting machine or manually with a convenient cutting tool using a stencil (for example, a grinder). Also, you should be able to bend the parts on a bending machine or manually, at the end welding the parts together according to the instructions and, if desired, cleaning and painting the finished product.Please note that the drawings are distributed on the condition that your finished product is a finished sculpture, the sale of welding kits based on my drawings is strictly prohibited.
The Rottweiler sculpture involves the manufacture of steel with a thickness of 1.5 mm and a bending radius of 1 mm. The minimum bending angle is 7 degrees, the maximum angle is 90 degrees. The weight of the sculpture is about 16 kg. There are 68 parts in total. The design documentation includes 46 pages, 44 of which are bending drawings. The instruction includes 31 pages in the order of assembly. There are mirror parts in the assembly and have an index (_01) and their bending must be performed in the other direction. The bend line is drawn along the cutouts in the part, in accordance with the drawing. The archive includes: dxf (44 pcs.- files separately), Drawings (46 pages), Instructions (31 pages). Overall dimensions of the sculpture (LxWxH):1161х369х862.
There is no engraving on the dxf, bending is performed along the line indicated by drop-shaped cutouts at the ends of the bending line.
DXF are available both in the form of parts separately, and placed for a sheet of metal with a size of 2500x1250mm.
If you need to create a stencil for printing in PDF format or create a DXF file with all the parts located on the sheet metal format you need, please contact me.
This digital product is not for distribution (dxf, PDF), it is intended for you and your production.
Please note that the drawings are distributed on the condition that your finished product is a finished sculpture, the sale of welding kits based on my drawings is strictly prohibited.