Automatic loading and unloading visual detection equipment

Automatic loading and unloading visual detection equipment 3D model

Description
  1. One empty material plate should be reserved on the receiving mechanism each time, and then the full material plate should be placed into the feeding mechanism. 2. After the loading manipulator takes up the product of the full material plate, the material plate moving mechanism will move the empty material plate and implant it into the receiving mechanism. 3. When feeding and receiving products, the transfer platform to avoid sharing the platform with testing institutions to reduce the waiting time. 4. Four groups of CCD testing institutions check the products at the same time, and the movement between the testing institutions also moves synchronously. 5. The receiving manipulator placed the pallet of the qualified products and implanted the NG storage box for NG products.
Item rating
0 0
Automatic loading and unloading visual detection equipment
$29.00
 
Royalty Free License 
Automatic loading and unloading visual detection equipment
$29.00
 
Royalty Free License 
Response - % in - h

3D Model formats

Format limitations
  • Parasolid (.x_t, .x_b)181 MB

3D Model details

  • Ready for 3D Printing
  • Animated
  • Rigged
  • VR / AR / Low-poly
  • PBR
  • Geometry -
  • Polygons 0
  • Vertices 0
  • Textures
  • Materials
  • UV Mapping
  • Unwrapped UVs Unknown
  • Plugins used
  • Publish date2024-11-23
  • Model ID#5661265
Chat