Booth - Simplicity - S Curve - Ottoman Combo

Booth - Simplicity - S Curve - Ottoman Combo Low-poly 3D model

Verification details of the FBX file
Files
Binary FBX
Scene
No unsupported objects
Geometry
No N-gonsNo faceted geometryManifold geometry
Textures and Materials
PBR texturesNo embed texturesSquare texturesPower of 2 texture sizesAssigned materials
UVs
No UV overlapsUV unwrapped model
Naming
Allowed characters
Description

Supa Models are high quality representation of real world objects.
Built for Architectural Visualization and interactive VR environments, Interior design still renderings and animations, and Game Design where accuracy is needed.

Key features:

  • Real-world scale (Units in mm)
  • Materials and textures(where needed) applied
  • Centered at world and origin (x0, y0, z0)
  • No lights or cameras
  • No plugins required

Please also view our collection packs for the most cost effective way to download a whole pack of models for one low price.
Please download a free model as a sample before purchasing.
If you encounter problems with any of the file formats, please let us know.

Item rating
0 0
Booth - Simplicity - S Curve - Ottoman Combo
$14.00
 
Royalty Free License 
Booth - Simplicity - S Curve - Ottoman Combo
$14.00
 
Royalty Free License 
Available in these collections
Response 0% in 48.0h

3D Model formats

Format limitations

3D Model details

  • Ready for 3D Printing
  • Animated
  • Rigged
  • VR / AR / Low-poly
  • PBR
  • Geometry -
  • Polygons 0
  • Vertices 0
  • Textures
  • Materials
  • UV Mapping
  • Unwrapped UVs Unknown
  • Plugins used
  • Publish date2022-07-05
  • Model ID#3850536
Chat