DESCRIPTION

All questions regarding the project can be asked in direct instagram (@ta6urkin) or by e-mail (ta6urkin@gmail.com)

The 3D model is not included in the project.

This is a digital product (there is no physical product) intended for the independent production of sheet metal products. You should be able to cut out parts on a CNC metal cutting machine or manually with a convenient cutting tool using a stencil (for example, a grinder). Also, you should be able to bend the parts on a bending machine or manually, at the end welding the parts together according to the instructions and, if desired, cleaning and painting the finished product.Please note that the drawings are distributed on the condition that your finished product is a finished sculpture, the sale of welding kits based on my drawings is strictly prohibited.

Rock Planter involves the manufacture of steel with a thickness of 1.5 mm and a bending radius of 1 mm. The weight of the Rock Planter is about 15,5 kg. There are 9 parts in total. The design documentation includes 11 pages, 9 of which are bending drawings. The instruction includes 6 pages in the order of assembly. The bend line is drawn along the cutouts in the part, in accordance with the drawing. The archive includes: dxf (9 pcs.- files separately), Drawings (11 pages), Instructions (6 pages).

There is no engraving on the dxf, bending is performed along the line indicated by drop-shaped cutouts at the ends of the bending line.

If you need to create a stencil for printing in PDF format or create a DXF file with all the parts located on the sheet metal format you need, please contact me.

This digital product is not for distribution (dxf, PDF), it is intended for you and your production.

Please note that the drawings are distributed on the condition that your finished product is a finished sculpture, the sale of welding kits based on my drawings is strictly prohibited.

Thank you and good luck with your work!

REVIEWS & COMMENTS

See what other buyers think about this model - real feedback on quality,
accuracy, and usability.
There are no reviews or comments yet. Please be the first one to write it.

Welding Project Plans Drawings Rock Planter DXF PDF 3D model

Custom License
Like this model to show appreciation to the designer.
See how many times this model was viewed.
Share this model to support the designer and boost their visibility.
File formats
DXF
DXF<br />File Size: 1 MB
PDF
PDF | 2 files<br />File Size: 2 MB
Provided by designer
Information and details shared directly by the model's designer.
3D printing
Indicates whether the designer marked this model as suitable for 3D printing.
Model is not 3D printable
The designer indicates this model is intended for digital use only (rendering, animation, or AR/VR) and not for 3D printing.
Geometry
Other
The model uses a different geometry type (e.g., voxels, point cloud).
Unwrapped UVs
Publish date
Model ID
Chat